Date of Award
9-1992
Document Type
Thesis
Degree Name
Master of Science
First Advisor
David S. Christensen, PhD
Second Advisor
Richard Antolini
Abstract
This thesis effort provides a valuable tool for contract performance measurement (CPM) analysts to use both while attending formalized Cost/Schedule Control Systems Criteria (C/SCSC) training, and while on the job. Research indicated a large amount of written material existed on contract performance measurement and the more specific topic of C/SCSC, yet this information was hidden in a wide array of unindexed professional journals, master's thesis, and texts. Further, while many professions have a reference guide of annotated bibliographies, CPM had none. Through an extensive literature review using several search and retrieval methods, the authors were able to amass a bibliography of nearly 100 professional journal articles, thesis, and texts which address contract performance-measurement issues within 11 more specific topic areas. While these sources do not begin to represent a census of the available information, it does represent a wide cross-section of some of the more important contributions to the performance measurement knowledge base.
AFIT Designator
AFIT-GCA-LSY-92S-2
DTIC Accession Number
ADA258445
Recommended Citation
Cummings, Erik G. and Schneider, Kirk A., "Cost/Schedule Control Systems Criteria: A Reference Guide to C/SCSC information" (1992). Theses and Dissertations. 7407.
https://scholar.afit.edu/etd/7407
Included in
Finance and Financial Management Commons, Operations Research, Systems Engineering and Industrial Engineering Commons
Comments
The authors' Vita pages are omitted.
Presented to the Faculty of the School of Systems and Logistics