Date of Award
9-2025
Document Type
Thesis
Degree Name
Master of Science in Engineering Management
Department
Department of Systems Engineering and Management
First Advisor
John J. Elshaw, PhD
Abstract
The Royal Saudi Air Force (RSAF) relies on efficient logistics to sustain readiness. At King Abdulaziz Air Base, warehouse receiving inefficiencies caused delays and waste. This study used Lean principles and a six-month time–motion analysis, with Pareto and Fishbone tools, to identify 55% waste in dead pile and 75% in palletized shipments. Standard times of 5.98 and 6.55 minutes were set. Key recommendations include SOPs, cross-training, forklift certification, layout redesign, and RFID. Lean adoption could save 100+ labor hours and $4,000 annually, improving safety, accuracy, and mission readiness.
AFIT Designator
AFIT-ENV-MS-25-S-002
Recommended Citation
Alghamdi, Saleh A., "Implementing Lean Principles to Enhance Warehouse Operations At King Abdulaziz Air Base(KAAB): A Case Study of Royal Saudi Air Force (RSAF)" (2025). Theses and Dissertations. 8364.
https://scholar.afit.edu/etd/8364
Included in
Operations and Supply Chain Management Commons, Operations Research, Systems Engineering and Industrial Engineering Commons
Comments
An embargo was observed for posting this thesis.
Approved for public release (Distribution A), distribution unlimited. PA case number 88ABW-2025-0752