An Analysis of Procurement Lead Time for Reparable Spares within the Air Force Logistics Command
Date of Award
9-1991
Document Type
Thesis
Degree Name
Master of Science
Abstract
As part of a larger process to define and model the logistics pipeline, this research focused on the acquisition subsystem and, within that subsystem, on variations in procurement lead time for reparable spares. Knowing both the length and variation in procurement lead times is vitally important for accurate prediction of these times. Inaccurate prediction of lead times may result in spares being ordered too early or too late, either wasting resources or adversely impacting mission requirements. Therefore, the study identified the key components of procurement lead time within AFLC and examined factors that may have significant influences on those lead times. Procurement lead time was divided into administrative and production lead times. Administrative lead time was further divided into precontract and contract administrative lead time. Analysis of variance models were used to test the possible effects of product type, dollar amount of the contract, whether the award was competitive or not, which ALC was involved in the procurement, and the type of contract used.
AFIT Designator
AFIT-GCM-LSY-91S-12
DTIC Accession Number
ADA243931
Recommended Citation
Norman, Patricia M., "An Analysis of Procurement Lead Time for Reparable Spares within the Air Force Logistics Command" (1991). Theses and Dissertations. 8087.
https://scholar.afit.edu/etd/8087
Comments
There is no digital version of this thesis available at this time.
Presented to the Faculty of the School of Systems and Logistics of the Air Force Institute of Technology, Air University, in Partial Fulfillment of the Requirements for the Degree of Master of Science.