Date of Award

9-1-1993

Document Type

Thesis

Degree Name

Master of Science

Abstract

This thesis developed a method to bound cost estimates with a prediction interval of costs for the Remedial Investigation/Feasibility Study (RI/FS) phase of the Installation Remediation Program (IRP) process. The prediction interval provides a reasonableness cross check for RI/FS project cost estimates. To develop the cost bounds, three major activities occurred. First, a database was developed from RI/FS projects managed by the Army Corps of Engineers. Second, a regression cost model was developed from the observations in the database. Third, a prediction interval specified at the 70 percent confidence level was derived from the cost model. This prediction interval provides a method to cross check RI/FS cost estimates. The prediction interval also provides a heuristic to bound RI/FS point estimates to incorporate uncertainty. There are limitations to the cost model which affect the use of the cost intervals. The observations used to develop the cost model were limited to RI/FS projects whose field activities only included soil boring and monitoring well activities. The cost intervals should only be applied to similar type projects.

AFIT Designator

AFIT-GCA-LAS-93S-6

DTIC Accession Number

ADA273924

Comments

Presented to the Faculty of the School of Logistics and Acquisitions Management of the Air Force Institute of Technology

The authors' Vita pages are omitted.

Share

COinS