Date of Award
9-1995
Document Type
Thesis
Degree Name
Master of Science
First Advisor
Caisson M. Vickery, PhD
Second Advisor
David J. Murphy, PhD
Abstract
This study evaluates strategic planning and performance measurement within Aeronautical Systems Center (AS C) to determine if these processes are conducive to effective implementation of the Government Performance and Results Act of 1993 (OPRA). OPRA is a law that will soon affect every federal government agency, and is intended to redirect government attention from internal activities, processes, and products to external outcomes and results. A review of literature allowed the researcher to identify two elements of strategic planning and performance measurement that are critical to effective implementation of OPRA: measurable strategic goals and objectives related to outcomes; and measurement of external outcomes. Interviews and document analysis were conducted to determine the extent to which these elements exist within ASC. The results of the interviews and document analysis led the researcher to conclude that strategic plans within ASC generally lack external focus, lack measurable goals and objectives, and are not fully implemented. Also lacking is measurement of organizational outcomes. Consequently, these conditions within ASC pose a significant challenge to effective implementation of OPRA.
AFIT Designator
AFIT-GSM-LAS-95S-7
DTIC Accession Number
ADA300849
Recommended Citation
Skrodzki, Miro, "Strategic Planning, Performance Measurement, and the Government Performance and Results Act of 1993: An Exploratory Study of Aeronautical Systems Center" (1995). Theses and Dissertations. 6490.
https://scholar.afit.edu/etd/6490
Comments
The author's Vita page is omitted.
Presented to the Faculty of the Graduate School of Logistics and Acquisition Management of The Air Force Institute of Technology