Author

James Goljan

Date of Award

3-10-2021

Document Type

Thesis

Degree Name

Master of Science

Department

Department of Systems Engineering and Management

First Advisor

Jonathan D. Ritschel, PhD

Abstract

The study has two research objectives. The first research objective develops a proof of concept for a Cost of Delay (CoD) framework to evaluate the Air Forces Kessel Run Software Factory. CoD provides a means to justify and prioritize competing interests regarding budgetary, manpower, and overall strategic decisions. DoD organizations can employ a cost minimization framework to conduct CoD Analysis. The results demonstrate Software Factories eschew trends in the literature towards more complicated cost models that incorporate machine learning with Data-Based techniques in lieu of simpler models that utilize Engineering Build-up Capacity Based techniques.

AFIT Designator

AFIT-ENV-MS-21-M-231

DTIC Accession Number

AD1136763