Date of Award

3-20-2006

Document Type

Thesis

Degree Name

Master of Science in Engineering Management

Department

Department of Systems Engineering and Management

First Advisor

Alfred E. Thal, Jr., PhD

Abstract

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a "risk-based decision" be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a decision model to determine if EVM is warranted on the project. Due to the cost of implementing EVM, this model should probably be used only on Air Force construction projects with cost estimates over $5 million. If the cost growth predicted by the model is greater than 5%, the use of EVM is recommended to monitor the risk factors. However, this recommendation should be tempered with the overall risk associated with a given project. In other words, if the calculated cost growth is high but the probability of occurrence is low, the decision-maker may want to forego the use of EVM and the associated costs. The questions addressed by this research are as follows: (1) What risk factors affect the cost or schedule of Air Force construction projects?; (2) What is the probability of occurrence of the identified risk factors?; (3) What is the subsequent cost growth due to the occurrence of the risk factors?; and (4) How many Air Force construction projects accomplished in the last 5 years and those programmed through FY12 exceed the $20M threshold or fall into a range that must be evaluated?

AFIT Designator

AFIT-GEM-ENV-06M-17

DTIC Accession Number

ADA446843

Comments

Alternative title on SF298: Earned Value Management: Implementation Plan for Air Force Civil Engineering

Share

COinS